Logo
PRIMER 22.1

Synchronised Operations

Synchronised Operations

Both commands and data can be exchanged across the link using the following methods:

Edit Load Curve in T-HIS

Load curves in PRIMER can be sent to the linked session of T-HIS, see: LOAD CURVES for more details.



Previous | Next